Illustrative screen flows covering the complete VOCheck application. Screens and components included in Demo 1 are identified throughout; all remaining screens represent the full planned scope beyond the initial demo.
| Flow | Title | Demo 1 | Notes |
|---|---|---|---|
| Auth | |||
| 00.A | Login | Full | All roles. Forgot-password link visible but not wired. |
| 00.B | Context Switcher | Not included | Design intent. Org & role switcher triggered by tapping the role badge. Not required for Demo 1 — all demo users have a single org and single role. |
| Manager | |||
| 01.A | Add Driver | Full | Account created directly — credentials shown on screen. No email invitation sent.push |
| 01.B | Edit Driver | Full | |
| 01.C | Create VOC | Full | Assessor assigned directly. No push or email notification sent to driver or assessor on job creation.push |
| 01.D | Edit / Cancel VOC | Full | No notification sent to assessor or driver when job is edited or cancelled.push |
| Driver | |||
| 02.A | Successful — FFD + Pre-Start | Full | Offline queue is built — submissions are stored locally if signal is lost and synced on reconnect. Demo assumes stable connectivity.connectivityiOS limit |
| 02.B | FFD Failed | Full | |
| 02.C | Defects Found | Partial | Defect logging and submission included. Photo capture shown as design intent — upload and storage deferred. Auto-resolve / manager sign-off workflow deferred. |
| 02.D | Pre-VOC Training | Not included | Full training-resource feature deferred. Driver receives a VOC notification only (see 06.A). |
| Assessor | |||
| 03.A | VOC Assessment | Partial | Dashboard, job detail, checklist and submission included. Photo evidence upload / storage deferred. Job history (Screen 1b) shown as design intent only. Assumes connectivity during assessment — offline queue applies but background sync on iOS requires native shell.connectivityiOS limit |
| Super Admin | |||
| 04.A | Super Admin | Partial | Org and account management included. "Log in as user" impersonation may be deferred. |
| Reports | |||
| 05.A | Daily Fleet Status | Partial | Report UI and data shown. Date navigation and Export / Print are design intent — wiring deferred. |
| 05.B | Driver Compliance Summary | Partial | Per-driver compliance cards shown. Period selector and trend data require aggregation queries — deferred. |
| 05.C | Compliance Audit Export | Partial | Filter UI and record preview shown. PDF / CSV generation is post-Demo 1. CoR-ready format documented in spec. |
| Platform | |||
| 06.A | Notifications | Not included | Shown as design intent. Push / email delivery requires APNs / FCM infrastructure — not configured for Demo 1. Read / unread state management deferred.push |